Axiom 2014 Annual Report - page 15

The assays contain some encouraging results,
including 4.35m @ 0.91 g/t Au and 7.22 g/t Ag
from 7.5m including 1.85m @ 1.52 g/t Au and
2.85m @ 9.70 g/t Ag in hole HVDD005.
Trenching results from the Taho prospect have
upgraded and extended the surface mineralisation
zone to 1.5km long.
In 2015, Axiom will commence drilling at the Polo
prospect area as the further potential at Taho
is assessed.
13
2014 Annual Report
1...,5,6,7,8,9,10,11,12,13,14 16,17,18,19,20,21,22,23,24,25,...116
Powered by FlippingBook